Development of the Grid Connection Scheme for a 500 MW Solar Photovoltaic Power Plant in Jizzakh Region

2024
image

Client: CEE INTERNATIONAL COMPANY LIMITED

In 2024, JSC "O'ZENERGOINJINIRING" developed the power evacuation and grid connection scheme for the 500 MW Solar Photovoltaic Power Plant in the Jizzakh Region, enabling its integration into the power system of the Republic of Uzbekistan.

The project included engineering studies to determine the optimal grid connection configuration, integration with existing transmission infrastructure, and technical solutions to ensure the reliable and stable operation of the national power system