Construction of the 100 MW / 200 MWh “Adolat” Battery Energy Storage System (BESS) and 220 kV Transmission Line Connection in Tashkent Region

2026
image

Client: LLC "UET Construction". Development of design documentation for the construction of the 100 MW / 200 MWh "Adolat" Battery Energy Storage System (BESS) in the Tashkent Region of the Republic of Uzbekistan, including the 220 kV transmission line loop-in/loop-out connection from "Fayziabad" Substation to "Adolat BESS" Substation. The project includes electrical system design, power evacuation schemes, relay protection and automation (RPA), substation automation, transmission line engineering, single-line diagrams, engineering calculations, equipment specifications, and preparation of comprehensive technical documentation. Status: In progress.