Project Details

All Projects

Expansion of the Chupon Ota 220 kV Substation and Construction of a New 220 kV Transmission Line in Samarkand Region

2023
image
+5

Client: Samarkand Main Electric Networks Branch of JSC "National Electric Networks of Uzbekistan"

In 2023, JSC "O'ZENERGOINJINIRING" developed the design for the expansion of the Chupon Ota 220 kV Substation, including the installation of the AT-5 autotransformer, as well as the construction of a new 220 kV overhead transmission line in the Samarkand Region.

The project is aimed at improving the reliability of the regional power supply system, increasing transmission capacity, optimizing network load distribution, and ensuring a stable and uninterrupted electricity supply for consumers.