Project Details

All Projects

Construction of 100 MW / 200 MWh Battery Energy Storage Systems (BESS) at Hakan, Obi-Hayot, Ohangaron and Qizil-Ravot

2026
image
+30

Client: Central Southern China Electric Power Design Institute Co., Ltd. of China Power Engineering Consulting Group Corporation. Development of design documentation for the construction of 100 MW / 200 MWh Battery Energy Storage Systems (BESS) at the Hakan, Obi-Hayot, Ohangaron and Qizil-Ravot sites. The project includes power evacuation schemes, electrical system design, relay protection and automation (RPA), substation automation, single-line diagrams, equipment specifications, engineering calculations, and related technical documentation. Status: In progress.