All Projects
Topographic and Engineering Geological Surveys for the 500 kV Transmission Line between Karakul and Nurabad Substations
2025
Client: UET Construction LLC
In 2025, JSC "O'ZENERGOINJINIRING" carried out topographic and engineering geological surveys for the construction of the 500 kV overhead transmission line between the Karakul 500/220/10 kV Substation and the Nurabad 500/220/10 kV Substation.
The project included detailed topographic surveying, engineering geological investigations, and geotechnical assessments along the transmission line corridor. The collected data provides the technical foundation for the safe, reliable, and efficient design and construction of this extra-high-voltage transmission infrastructure.